IECEx Testing Register – Offsite and Witness Testing Agreements
There are various situations that necessitate that testing of Ex equipment for the purposes of IECEx Certification be conducted at a facility other than an IECEx Testing Laboratory (ExTL). In recognition of these practical, technical and economic needs and to ensure that such testing is conducted under controlled conditions, all off-site testing and witness testing facilities currently being employed by ExTLs must be formally registered. The key information used for the registration is made available here for use in verifying that all IECEx off-site testing and witness testing has been conducted under a valid and current agreement between the facility and their supervising ExTL.
Free Ref #
|
ExTL
|
Organisation Type
|
Organisation Name
|
Testing Address
|
Standard, Edition, Clause
|
Limitations
|
Qualification Date
|
Valid Until
|
Comments
|
|
---|---|---|---|---|---|---|---|---|---|---|
80061595 |
CSA Group (Toronto) |
Manufacturer |
Endress + Hauser Flowtec AG |
Kagenstrasse 7 Reinach, Basel Land 4153, Switzerland |
IEC 60079-0, Ed. 7, Clauses 6.3, 26.4.2, 26.4.3, 26.4.5, 26.5.1, 26.5.2, 26.7, 26.8, 26.9, 30.1 IEC 60079-1, Ed. 7, Clauses C.3.3.1, C.3.4.1, C.15.1.3 IEC 60079-7, Ed 5.1, Clauses 4.2.3, 6.1, 6.10, 9.11 IEC 60079-11, Ed 6, Clauses 10.1.5.3, 10.2, 10.3, 10.4, 10.6.2, 10.7, 10.10, 13a IEC 60079-15, Ed. 5, Clauses 6.2, 7.3.5, 22.3, 22.3.1, 13.1 IEC 60079-26, Ed. 3, Clause 4.1.3.2 IEC 60079-31, Ed. 2, Clauses 6.1.1, 6.1.2 |
N/A |
2020-11-11 |
2021-11-11 |
N/A |
|
PR456626 |
FM Approvals USA (FMG) |
Manufacturer |
ABB Automation Products GmbH |
Dransfelder Straße 2, 37079 Göttingen Germany |
IEC 60079-7,Ed 5.1,6.1 |
None |
2020-11-03 |
2021-11-03 |
||
PR456157 |
FM Approvals USA (FMG) |
Manufacturer |
nVent Thermal LLC |
899 Broadway St & 2555 Bay Road Redwood City, CA 94063 USA |
IECEx 60079-0,Ed 7, 5.2 IECEx 60079-0,Ed 7, 5.3.1 IECEx 60079-0,Ed 7, 5.3.2.2 IECEx 60079-0,Ed 7, 5.3.2.3.2 IECEx 60079-0,Ed 7, 26.4.1.1 IECEx 60079-0,Ed 7, 26.4.1.2.3 IECEx 60079-0,Ed 7, 26.5.1.2 IECEx 60079-0,Ed 7, 26.5.1.3 IECEx 60079-0,Ed 7, 26.8 IECEx 60079-0,Ed 7, 26.9 IECEx 60079-0, Ed 7, 26.4.2 IECEx 60079-31, Ed 2, 6.1.1 IECEx 60079-31, Ed 2, 6.1.2 IEC/IEEE 60079-30-1, Ed 1, 5.1.2 IEC/IEEE 60079-30-1, Ed 1, 5.1.3 IEC/IEEE 60079-30-1, Ed 1, 5.1.4 IEC/IEEE 60079-30-1, Ed 1, 5.1.5.1 IEC/IEEE 60079-30-1, Ed 1, 5.1.5.2 IEC/IEEE 60079-30-1, Ed 1, 5.1.6 IEC/IEEE 60079-30-1, Ed 1, 5.1.7 IEC/IEEE 60079-30-1, Ed 1, 5.1.8 IEC/IEEE 60079-30-1, Ed 1, 5.1.9 IEC/IEEE 60079-30-1, Ed 1, 5.1.10 IEC/IEEE 60079-30-1, Ed 1, 5.1.11 IEC/IEEE 60079-30-1, Ed 1, 5.1.12 IEC/IEEE 60079-30-1, Ed 1, 5.1.13.2 IEC/IEEE 60079-30-1, Ed 1, 5.1.14 IEC/IEEE 60079-30-1, Ed 1, 5.1.15 |
None |
2020-06-19 |
2021-06-19 |