ExTAG
-
Agenda ItemDocument NumberTitle
-
Decision List The Twenty Fifth Meeting of the ExTAG held in Edinburgh, UK 18th and 19th September 2023
-
3.1
The Twenty Fourth Meeting of the ExTAG held remotely – 6th September and 7th September 2022
-
7.1
Report from ExTAG Working Group 01 (WG 01): Preparation of assessment and test report forms (ExTRs)(revised)
-
7.4 ExTAG 7.3
OD 024
IECEx Rules of Procedure covering testing, or witnessing testing at a manufacturer’s or user’s facility (Ed 4.0)
-
9.3
IECEx-OD-035-Ed3.1
A procedure to generate, discuss, report and publish ExTAG Decision Sheets Ed. 3.1
-
10.1
ExTAG/706/CD Draft ExTAG Decision Sheet – Revision of ExTAG DS 2020/003 Verification and Operation of Climate Chambers
-
10.1
Compilation of Comments on ExTAG/706/CD Draft ExTAG Decision Sheet – Revision of ExTAG DS 2020/003 Verification and Operation of Climate Chambers
-
10.1
ExTAG/706A/CD Draft ExTAG Decision Sheet – Revision of ExTAG DS 2020/003 Verification and Operation of Climate Chambers
-
10.2
Draft ExTAG Decision Sheet – Applicability of erosion and non-transmission tests on cable glands and conduit sealing devices sealed with setting compound in case of leakage
-
10.2
Compilation of Comments on -ExTAG/699/CD - Draft ExTAG Decision Sheet – Applicability of erosion and non-transmission tests on cable glands and conduit sealing devices sealed with setting compound in case of leakage