ExTAG

Documents are now Secure.  Please use the standard Members password to access the documents. If you experience any difficulty please email the Secretariat.

info@iecex.com

  • Agenda Item
    Document Number
    Title
  • 3.1
    Decision List The Twenty Third Meeting of the ExTAG held in webinar format on 31st August and 1st September 2021.

  • 2
    The Twenty Third Meeting of the ExTAG To be held remotely – Tuesday 31st August 2021 Wednesday 01st September 2021

  • 3.1
    The Twenty Second Meeting of the ExTAG held in webinar format on 29th and 30th September 2020

  • 3.1
    Report of The Twenty Second Meeting of the ExTAG held remotely - September 29th and September 30th 2020

  • 3.2
    Status Report on Action Items from the 2020 ExTAG Remote Meeting

  • 5.1
    Discussion paper regarding dielectric strength test

  • 5.1
    Discussion paper regarding dielectric strength test

  • 5.2
    Discussion Document – Increasing Ambient Temperatures

  • 5.3
    Discussion Document – Subcontracting of Tests within the IECEx Certified Equipment Scheme

  • 7.2
    Report from Mr. Ron Webb, ExTAG WG 03 Convenor, Documentation and Drawing Requirements - OD 017 Drawing and documentation Guidance for IEC Ex Certification – for use by Manufacturers and ExTL

  • OD-012

    ExTAG Guide for Application of Uncertainty of Measurement to conformity for laboratory tests carried out under the IECEx System OD 012 Ed.3.0

  • 8.2.2, ExTAG 7.3
    Amendment to IECEx OD 012, Edition 2.0

  • 7.4 ExTAG 7.3
    OD 024

    IECEx Rules of Procedure covering testing, or witnessing testing at a manufacturer’s or user’s facility (Ed 4.0)

  • 7.5
    Report from Tim Krause, Convenor ExTAG WG 10, Proficiency Testing

  • 7.5
    Draft Revision of OD 202 IECEx Proficiency Testing Scheme Ed.3

  • 7.5
    OD 207

    Guidance on the Retention of Records. (Ed. 2.0)

  • 7.8
    OD 034

    Operational Document - Guidance on the preparation of IECEx Equipment Certificates and Reports covering more than one identifiable item of equipment Ed. 3.0

  • 8.1.1
    ExTAG/659/Inf – Role of IECExTAG Decision Sheets

  • 8.1.2
    Draft Decision Sheets withdrawn as well as Decision Sheets Published since 2020 Remote ExTAG Meeting

  • 8.2.1
    Reconfirmation of Decisions Sheets falling under the 5 year review (2015)

  • 8.2.2
    ExTAG Decision Sheet - Enhanced clearance and creepage distances

  • 8.2.2
    Application of Failure Analysis such as FMEA in intrinsic safety “i”

  • 8.3
    Initial Draft for the Revision of IECEx OD 035 – Procedures to generate and maintain IECEx ExTAG Decision Sheets (DS)

  • 9.1
    ExTAG/635A/CD Draft ExTAG Decision Sheet - Field modular approach for Ex Equipment

  • 9.1
    Compilation of comments on - ExTAG/635/CD – Draft ExTAG Decision Sheet - Field modular approach for Ex Equipmen

  • 9.2
    ExTAG/663/CD Draft ExTAG Decision Sheet – IEC 60079-6 High Voltage Testing

  • 9.3
    ExTAG/661/CD – Draft ExTAG Decision Sheet – Information relevant to particular protection Ex 60079-46 into the quality management system.

  • 12.1 ExTAG 12
    Notification of issue of IEC Administrative Circular AC/23/2020